Piper Aircraft Internship, Summer 2025

During a twelve-week summer internship at Piper Aircraft, Inc. in Vero Beach, Florida, I worked as a test and instrumentation engineer in the Test & Instrumentation Lab, part of the company's Experimental wing. I owned two Engineering Work Orders (EWOs) from the Structural Department: one covered tensile, flexural and short beam shear tests of a new composite material, and the other covered fatigue testing of aircraft spar specimens.

Challenge

  • Characterizing a new composite: The first EWO had to characterize a new material for the composites on the aircraft cowling, because the results feed the allowables for future composite structural analysis. It covered 36 specimens, split evenly between Cowl Skin (CS) and Resin-infused Panel (RP) coupons.
  • A new machine and software: Every test ran on the MTS Landmark Servo-Hydraulic 370.25 load frame, with its Station Manager and TestWare Elite (TWE) software, which I had not used before.
  • A missing fixture: The lab had no suitable fixture for 3-point bending, so the flexural test could not start until one was designed and built.
  • Configuring fatigue testing from scratch: The second EWO required setting up the specialized MTS machine for fatigue testing in general, then designing a 20 million cycle test in the proprietary TWE software.
  • Very large data files: The fatigue test produced data files of about 2 to 4 GB each, and the software's built-in post-processing was convoluted and caused technical issues.

Action

For each EWO, I designed the test setup, developed or sourced the tools and fixtures, researched the applicable standards, resolved conflicts and ambiguities with the Structural Department, ran the tests and captured the data. I then documented and signed off the work order, had it verified and stamped by QC, and submitted it to the Data Release Specialist for closure.

Load frame setup

The frame has two 100 kN load cells. The top load cell connects to the locked crosshead through a 250 kN load cell, and the bottom one connects to the actuator. Displacement comes from the bottom actuator through LVDT sensors wired to the data acquisition (DAQ) ports. All tests in the first work order used the 2.5 GPM hydraulic flow channel.

Tensile test

I pre-conditioned the samples, then tested 10 specimens per ASTM D638 using a company template in TWE, entering the work order's parameters in the Procedure tab.

ParameterValue
Constant crosshead speed0.05 in/min
Initial spacing between grips4.5 in (including a 1 in grip on each side)
StandardASTM D638

Flexural test

I chose the 3-point bending method for 10 specimens per ASTM D790. Because no fixture existed, I designed a custom one in Siemens NX, which was new to me, though my SolidWorks certification made it quick to learn. I modeled eight parts and worked with the tooling department through several design-to-fabrication iterations, translating the ASTM requirements into manufacturable design intent.

ParameterValue
Span2.75 in
Constant crosshead speed0.075 in/min
StandardASTM D790

Short beam shear test

The short beam shear test looks like the flexural test, but its shorter moment arm makes shear forces dominate instead of bending forces. I ran it per ASTM D2344.

ParameterValue
Span2/3 of the specimen length
Constant crosshead speed0.050 in/min
StandardASTM D2344

Fatigue test

The second EWO tested 6 specimens of the vertical aft spar: 3 high torque samples with fasteners torqued to 90 in-lb and 3 low torque samples torqued to 30 in-lb, to compare the effect of fastener torque.

  • One load cycle went from 122.5 ± 6.2 lbf to 1225 ± 62 lbf and back, at 20 to 25 Hz.
  • Each specimen ran 20 million cycles in intervals of 5 million cycles.
  • After each interval, I un-torqued the nuts with a dial-type torque wrench with a memory pointer, measured the holes, had an authorized inspector perform a surface eddy current inspection, and torqued the bolts back to the rated value per company specifications.

Designing the test in TWE was the most intensive part of the work. It required constant contact with MTS technical support, reading the documentation, and repeated testing and development. I also tried to push Python code into TWE through its API, but obstacles forced a different route. Because the software's post-processing was unreliable, I wrote a MATLAB script that read the multi-gigabyte data files, counted the valid cycles, plotted load versus time, and checked that the loads stayed within the EWO's tolerances.

Result

  • Composite data delivered: The tensile test produced data files of load (lbf), displacement (in) and time (s), which I post-processed in Excel into stress versus displacement plots and Ultimate Tensile Strength (UTS) values. The work order's deliverables also included calculations of the resin and fiber weight percentages for the cross-functional review.
  • A custom fixture: The tooling department fabricated my 3-point bending fixture from my NX models for the flexural test setup.
  • A running fatigue test: I configured the machine for fatigue testing, helped initiate the test, and took one specimen through the full 20 million cycles, with the MTS and hydraulic pumps running around the clock. The full work order was expected to take more than two months, so I completed only part of it.
  • Smaller data files: My MATLAB script let me check the fatigue data in real time, and I later found a solution within the software that cut the file size to about 700 MB.
  • Documentation: I wrote a comprehensive procedural manual for the MTS machine in Overleaf.
  • Skills gained: I performed fatigue testing and short beam shear testing for the first time, learned Siemens NX, TW Elite and Station Manager, and logged more than 100 hours in the machine shop, including work on a manual lathe.